Trowbridge Town Hall
A catalyst for Trowbridge
Purcell has transformed Trowbridge Town Hall into an inclusive and sustainable cultural destination, restoring the Grade II-listed landmark to its original community use.
Appointed in 2022 as lead consultant, architect and heritage consultant, we worked with Wiltshire Council and The Old Town Hall Trust to bring the building back to the heart of community life. The project has repaired and protected its historic fabric while creating an accessible home for performance, creativity, learning and public gathering.
One entrance for everyone
Accessibility was fundamental to the Town Hall’s renewed civic purpose.
Previously, visitors requiring step-free access were directed away from the principal entrance to a side door and a steep, non-compliant ramp. From there, they had to navigate back-of-house corridors before reaching the public spaces.
A new gently graded approach has been integrated alongside the historic entrance steps, allowing everyone to arrive independently through the same entrance. The intervention preserves the prominence and character of the Victorian facade while removing the physical and psychological barriers created by a separate entrance.
The significance of this apparently simple change is captured in the words of one wheelchair user:
“I didn’t think it mattered to me having to use a separate entrance after 16 years as a wheelie. But, well, it turns out it does matter. I came in through the front door like everyone else and that blew me away. It’s so much more inclusive and welcoming.”
A larger, fully compliant lift now provides access to the principal public floors. Four new accessible WCs have also been introduced, alongside three unisex toilets and a dedicated Changing Places facility. One of only two such facilities in Trowbridge, and the only one within a cultural building, it enables people with profound and multiple disabilities to participate more fully in public life.
Clearer circulation, improved lighting and carefully considered colour contrast support more intuitive navigation. Acoustic treatments within the foyer, Great Hall, Gallery, Park View and Old Courtroom reduce reverberation and improve speech clarity, creating more comfortable spaces for conversation, performance and community activity.
Conservation supporting climate action
The project demonstrates how a complex historic building can make a meaningful transition towards a low-carbon future.
Retention and adaptation formed the foundation of the sustainability strategy. Extensive repairs to the roofs, masonry and windows have halted deterioration and extended the building’s life, avoiding the considerable embodied carbon that demolition and replacement would have created.
The Town Hall is now fossil-fuel-free. Its obsolete building services and gas heating have been replaced with air source heat pumps, which serve refurbished historic radiators alongside sensitively selected new systems. Heat-recovery ventilation and intelligent controls respond to occupancy and internal conditions, allowing energy to be used where and when it is needed.
Targeted fabric improvements were informed by dynamic thermal modelling and are expected to reduce regulated energy demand by approximately 30%. The Great Hall roof was insulated using a breathable construction that protects the historic structure, with original slates retained and reused wherever possible. Secondary glazing has been introduced in sensitive areas, with higher-performing windows installed where the heritage significance permitted.
Together, these interventions improve comfort and environmental performance while retaining the building’s authenticity, showing how conservation and climate action can reinforce one another.
Today, the Old Town Hall hosts activities ranging from drama classes for adults with learning disabilities and neurodivergent support groups to exercise classes, family programmes and live performances.
A catalyst for Trowbridge
The impact of the project reaches well beyond the Town Hall’s walls.
Shaped through consultation with its operators, tenants, community groups and local people, the renewed building responds directly to how it will be used. Its programme creates new opportunities to participate in culture, develop creative work, meet others and feel part of the town.
By drawing people into the centre throughout the day and evening, the Town Hall strengthens Trowbridge’s cultural offer, supports local businesses and creative industries, and contributes to wider regeneration. Its combination of performance spaces, community facilities and income-generating uses also gives the building a resilient foundation for the future.
More than the restoration of a significant historic building, the project gives Trowbridge back a place where people can gather and belong. It ensures the Town Hall can once again serve as a source of civic pride at the centre of community life.
– Councillor Mel Jacob, Leader, Trowbridge Town Council
Team
- Clare Phillips Associate Partner
- Nuria Garcia Senior Architect
Details
- Client Wiltshire Council
- Team Bristol Studio
- Location Trowbridge
- Country United Kingdom
- Listing Status Grade II
- Photography Diane Auckland/Fotohaus, Paul Blakemore
Awards
- RICS (Community Benefit) Shortlisted 2026